Electrical panel Permit needs The on-line permit is available for nature in piersonforcongress.com v a residential zoning district. Zoning district details is easily accessible on-line by clicking E-Zoning.

You are watching: What size aluminum ground wire for 200 amp service

This permit will permit replacement that the existing electrical panel up to a maximum of 200 amps in the very same location.Note: part properties in piersonforcongress.com have actually an underground electric power feeding from PG&E. If her property has an underground power feed, verify v PG&E the they can administer increased power for a bigger panel size.To recognize if the proposed dashboard is sized appropriately for your requirements OR if you want to see if the proposed panel is huge enough for an all-electric house, please complete an electric panel sizing spreadsheet. An electric permit is forced for replacement and upgrade that the key electrical company panel prior to installation the the new panel. Following is a listing of the general requirements for electric panel replacements based on the 2019 California electric Code. This directory is to plan to provide general information, contact the building Safety department for any questions or added information.General Requirements - The main electrical company shall be set up with strict conduit. Electric metallic tubing may be supplied where the organization drop is attached come the building. The service entrance cable may be used, detailed the approved fittings are used with the cable, such as a rain-tight service head or developing the cable goose-neck, recorded or painted, and held securely in ar by a fitting authorized for the purpose. (Article 230)The minimum size service conduit shall be 1-1/4”. The minimum size service entrance cable shall be rated 100 amperes minimum for solitary family dwellings. For single family homes, the business disconnect method shall have a rating of less than 100 amperes, 3-wire. A larger company may be required for brand-new homes or enhancements to currently homes based upon the actual fill calculations. (CEC 230.79(C))Service enntrance gate Conductors (Wires) – Conductors the extend throughout a roof shall have a minimum upright clearance the 3’ above the roof surface for roofs sloped 4:12 or an ext (18” clearance required when conductors enter through the roof overhang/eave). The company head candlestick be located so the the service drops, in addition to the open wires between the business head and also service drop, will have a minimum clearance of 10’ vertically over ground and also 3’ radius native doors and windows. (Article 230.24)The neutral (grounded) conductor must be identified with white tape at both terminals. (Article 200.6(B)(4))Service enntrance gate conductors and also cables chandelier be authorized for a wet ar and, when exposed to straight sunlight, candlestick be detailed and significant as “sunlight resistant.” organization entrance conductors and conduit shall be sized according to the following table (based on CEC thing 9 table 1):
SERVICE enntrance gate CONDUCTORS SIZE and RATING
Service or Feeder RatingCopper ConductorsAluminum or Copper-CladAluminumMinimum ConduitSize
100 Amps#4 AWG#2 AWG1 ¼ inch
125 Amps#2 AWG#1/0 AWG1 ¼ inch
150 Amps#1 AWG#2/0 AWG1 ¼ inch
200 Amps#2/0 AWG#4/0 AWG1 ½ inch
The grounding conductors need to be determined by white or grey tape at both end (200.6).Meter location - PG&E calls for the elevation of the meter to be 48” to 66” above the ground. PG&E prohibits brand-new meters ~ above exterior walls adjacent to bedrooms or bedroom closets. A minimum horizontal clearance of 36” native the gas meter and also piping is required.

See more: King Chrome Small Block Chevy 350 Intake Manifold Bolt Size ?

Working space - The clear working an are in prior of the panel shall be 30” large by 36” deep with a minimum headroom clearance of 6’-6” (Article 110.26)Grounding of Services - grounding shall covers a constant grounding electrode conductor operation from the panel to a ground stick (grounding electrode) and also to the cold water pipe. Ground connection of the electrical business at the main water line need to be within the an initial 5’ the water piping right into the building. The secret water business shall no be offered as the grounding electrode there is no supplemental electrode. For new structures and additions to existing structures, a concrete encased floor electrode shall it is in installed. This chandelier consist of 20’ the ½” bare or zinc-coated rebar or ceiling copper cable in the portion of the footing in call with earth. (CEC 250.52(A)(3)(1) and 250.52(A)(3)(2))For currently structures, the grounding electrode shall it is in nonferrous (copper), listed, and not be less than 5/8” in diameter. The electrode shall be installed such that at the very least 8’ of size is in contract v the soil. The upper finish of the electrode shall it is in flush with or below ground level unless the above-ground end and the ground connection electrode conductor attachments is protected against physical damage. (CEC 250.52 (A)(5), 250.64(B))The forced grounding electrode conductor (from electrode to panel) dimension is noted in the following table:
GROUNDING ELECTRODE CONDUCTOR SIZING (Table 250.66)
Size of key PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#8 AWG#6 AWG
150 Amps#6 AWG#4 AWG
200 Amps#4 AWG#2 AWG
Bonding - Bonding the the hot, cold, and gas currently is required when the electric panel is replaced. Bonding the the hot, cold, and also gas lines is compelled with water organization replacements (if using a less conductive material than is existing) and for all re-pipes. Bonding shall consist of a constant bond jumper mounted at the water heater between the hot, cold, and gas lines. The bonding jumper shall be sized based on the adhering to table. (CEC250.4(A)(4))
BONDING JUMPER SIZING (Table 250.102(C)(1))
Size of main PanelCopper ConductorsAluminum or Copper-Clad Aluminum
100 Amps#8 AWG#6 AWG
125 Amps#6 AWG#4 AWG
150 Amps#6 AWG#4 AWG
200 Amps#6 AWG#4 AWG
The electrical Panel permit is NOT easily accessible on-line if you are: installation the new electrical panel in a various location. installation a brand-new electrical panel larger than 200 amps. Installing additional sub-panels through the new electrical panel. Performing extr electrical job-related in conjunction through the brand-new electrical dashboard installation.
If any type of of the over conditions apply, the allow shall it is in issued at the One-Stop permit Center, City Hall, 456 W Olive Avenue. Specific process information is accessible at the Building department web site.
InspectionsA minimum of two inspections are required, a utility release and a final. The energy release inspection must be scheduled when the new panel is installed and ready to be hooked increase the PG&E supply. The building inspector will administer a energy release kind which will should be provided to PG&E to have the supply hooked as much as the brand-new panel. A cable lath inspection is required for stucco repairs. A last inspection should be booked after every one of the work-related is complete.
*